October was a month measured in megawatts. A 6 MW plant went live in central Ukraine. A 30 MWp supply agreement was signed for Ghana. And 15.6 MWp of Meteor modules arrived on site at a refinery in Brazil. In between, we took Terra onto camera, opened our website in Vietnamese and launched our page for the USA market and RE+. Here is how the month came together. 👇
1. 6 MW Now Powering Central Ukraine 🇺🇦
A new utility-scale solar plant with around 8,450 modules has come online in Shpola, Cherkasy region. It is built with AESOLAR Meteor AE710CME-132BDS, our N-type TOPCon bifacial double-glass module.
At about 7 GWh a year, the plant produces the equivalent of the annual electricity use of around 3,000 people in Ukraine, generated locally where energy independence matters most. Thank you to our EPC partner LLC Cetus for bringing another European utility project to life. 🤝

2. Terra on Camera: One Field, Two Harvests
Our interview series with NwComp Solar GmbH continued with episode 2. TerraV stands vertically, so farming continues between rows. It delivers up to 3.2% higher annual yield than standard modules in our analysis, and won the EUPD Research Top Innovation Award 2025.
TerraE goes above crops or into greenhouse roofs, letting over 40% of light through.
🎥 Watch episode 2: https://www.youtube.com/watch?v=rvh0nXfQ6zs

3. AESOLAR, Now in Vietnamese 🇻🇳
As our presence in Vietnam continues to grow, we opened our website in Vietnamese. Partners, installers, developers and solar professionals can now explore our modules, storage and projects in their own language.

4. Hi, America: Our Page for the USA Is Live 🇺🇸
Since 2003, German engineering has taken AESOLAR to 100+ countries. Next stop: Las Vegas. Ahead of RE+ 2026, we launched a dedicated page for the U.S. market. It covers our full portfolio:
- PERC, TOPCon and back-contact modules
- Agrivoltaics, carports and custom BIPV
- Residential storage and inverters
Visitors can share their project before the show, so we can prepare a focused conversation at Stand N2772.
👉 https://ae-solar.com/usa · 📍 Stand N2772, 🗓️ 17–19 November 2026

5. Cape Town: Conversations and a 30 MWp Signing for Ghana 🇿🇦🇬🇭
At Solar & Storage Live Cape Town (20–21 October, CTICC), Stand C2 brought us face to face with developers, EPCs and distributors from across Southern and West Africa.
The biggest moment of the show came on the stand: AESOLAR and Mustek Engineering (GH) Limited signed a 30 MWp module supply agreement. Every module is Meteor AE720CME-132BDS.
The timing matters. Ghana's peak demand reached 4,283 MW in 2025, up 8.4% in a year. Meanwhile, the country had 276.7 MW of PV installed at the end of 2025, and its Renewable Energy Master Plan targets another 852 MW by 2030. This one agreement equals more than a tenth of Ghana's installed PV. Congratulations to the Mustek team. We look forward to delivering together.

6. Brazil: 21,392 Meteor Modules on Site at Petrobras RNEST 🇧🇷
At Petrobras' Abreu e Lima Refinery (RNEST) in Pernambuco, a 15.6 MWp plant is under construction with 21,392 AESOLAR Meteor 730Wp bifacial N-type TOPCon modules.
The plant sits inside the refinery fence and powers the site directly, with an expected output of around 24 GWh a year. Piles are in, tables are rising, and our modules are waiting for their place in the Pernambuco sun.
EPC: BRAFER · End client: Petrobras

Closing & November Look Ahead
From Shpola to Pernambuco, October showed what happens when the right modules meet the right partners: plants that run, contracts that move markets and new doors opening in Vietnam and the U.S. Thank you to everyone who was part of it. November is already full:
🗓️ 3 November: something new is coming. Stay tuned.
📍 10–11 November: ASSS 2026, Jakarta, as Silver Sponsor
📍 17–19 November: RE+ 2026, Las Vegas, Stand N2772
🔗 explore our caralogue
It's time to save the world.
